Our team of skilled professionals worked diligently to ensure the highest level of precision and quality in the installation process. Utilizing the latest technologies, including the pneumatic screed pump and the state-of-the-art screed robot Clapa Floor Master, we were able to deliver a level and durable floor surface.
The advantages of semi-dry screed, such as its fast installation, reduced drying time, and minimal shrinkage, have truly proven their worth in this project. The floor is now ready for the installation of your preferred finishing covering, whether it be tiles, parquet, or linoleum.
The VUE (Lifestyle residences on the bay) provides 35 exclusive units, from one to 5 bedrooms, including nine exclusive two story sky villas with outdoor living rooms, all offering one of a kind views towards the Red Sea. Positioned on a 2,240 square meter site and with a total built up area of 11,700 square meters, the 12 story high- rise tower stands 69 meters tall.
We are pleased to share details about our recent project involving a seven-story residential building located on King Malik Road in Jeddah, Saudi Arabia. Our company was entrusted with providing high-quality screed works for the entire building.
Our dedicated team executed the floor screeding with precision and attention to detail, ensuring a flawless and durable finish. The superior quality of our screed has significantly contributed to the overall excellence of the building's floors, resulting in enhanced durability, smoothness, and levelness.
We take pride in our work, which has not only met but exceeded our client's expectations. The success of this project is a testament to our commitment to delivering high-quality construction services and achieving complete customer satisfaction.